Pembroke Road

Pembroke_webpage_10.2.2024.png

Project Development

Design a locally supported conceptual design for the segment of Pembroke Road, from SW 145th Avenue to Flamingo Road, that provides safe and comfortable bicycle and pedestrian facilities.  (1.55 miles in length)

Pembroke_Rd.png

What are the goals and objectives? 

  • Enhance bicycle safety – eliminate fatalities and serious injuries 
  • Increase Walkability and Accessibility – i.e. comfort, ease of use, ADA compliance  
  • Promote more walking and bicycling, less driving 
  • Increased connectivity between residential developments and points of interests along the corridor 
  • Construct a shared use path on the north side of the street that provides safer, protected facility for bicyclists and pedestrians to travel across the corridor.  
  • Placemaking and Wayfinding Initiatives

 Locally Preferred Alternative (LPA)

On February 27, 2024 the MPO presented the preferred alternative to the local community. 

Pembroke Road Intersection BeforePembroke Road Intersection  

Resources and Documents

Broward Complete Streets Master Plan: https://www.browardmpo.org/images/Broward_MPO_CSMP_final.pdf

For More Information

Please contact Christopher Restrepo at (954) 876-0061 or restrepoc@browardmpo.org to learn more about the Broward MPO and what they are working on in your community.