
In 2009, the Broward MPO approved the 2035 Metropolitan Transportation Plan (MTP). The Midtown Plantation and Southwest Sunrise Livability Study was the first Livability Planning Initiative to begin after the adoption of the 2035 MTP.
This Livability Study was a collaborative planning effort with the municipalities within the study area (City of Plantation and City of Sunrise), along with Broward County Transit and the Florida Department of Transportation (FDOT).
The purpose of the Livability Study was to conceptually identify a variety of improvements that contribute to transit-supportive development, with a 25-year planning horizon. The implementation would occur over time as funding becomes available and as conditions change.
The Study Area covers around 32 square miles with the boundaries at the Conservation Levee to the west, Interstate 595 to the south, Florida’s Turnpike to the east, and approximately 1/2-mile (one-half to one-quarter mile) north of Sunset Strip to the north. Major corridors in the Study Area include NW 136 Avenue, Flamingo Road, Hiatus Road, Nob Hill Road, Pine Island Road, University Drive, Sunrise Boulevard, Broward Boulevard and Peters Road. The limited-access I-595, Florida’s Turnpike and Sawgrass Expressway border the study Area.
Resources & Documents
Read the full Midtown Plantation & Southwest Sunrise Livability Study (PDF).