Broward County Sealed Corridor Project

Quick 010

Award Announced in June 2023: Broward County Sealed Corridor Project

(Federal Grant Amount: $15,440,000, Local Funding Amount: $3,860,000).

Project Objective: Increase safety at 20 at-grade crossings along the Florida East Coast Railway.

Corridor Details: Freight rail corridor shared with Brightline's intercity passenger rail service.

Collision Data: 17% of collisions result from motorists driving around entrance gates, with nearly 60% in Broward County.

Preventive Measures: Construct 19 new exit gates and six (6) raised medians at high-collision crossings.

Impact Areas: Target crossings with at least 27 collisions in the past five years.

Funding Sources: US Department of Transportation Federal Railroad Administration (FRA Grant), Broward County, City of Pompano Beach, City of Wilton Manors, City of Ft. Lauderdale, City of Dania Beach, City of Hollywood, and City of Hallandale Beach.

Grantee: Broward MPO.

 
Closing the Gaps. Preventing Collisions. Saving Lives.

Every day, dozens of passenger and freight trains travel through the heart of Broward County, connecting communities, moving commerce and strengthening the region's transportation network. But where railroad tracks intersect with busy local streets, a split-second decision behind the wheel can have devastating consequences.
The Broward County Sealed Corridor Project represents a major investment in safer crossings. Led by the Broward Metropolitan Planning Organization (MPO), the $19.3 million initiative will deliver targeted safety improvements at 20 railroad crossings along the Florida East Coast (FEC) Railway, a shared corridor carrying both freight trains and Brightline's intercity passenger rail service.
Supported by a $15.44 million federal grant from the Federal Railroad Administration (FRA), along with $3.86 million in local funding, the project brings together the MPO, Broward County, and municipalities throughout the corridor to resolve one of the region's most pressing transportation safety challenges.

 
Targeting Risk Where Roads and Rail Meet

With more than 60 estimated train movements along the corridor each day, improving safety at railroad crossings is essential to protecting motorists and everyone on the train and supporting the continued growth of passenger and freight rail service.
The project targets crossings with a documented history of collisions, including locations where motorists have driven around lowered entrance gates to beat an oncoming train. By strengthening physical barriers and improving roadway configurations, the improvements are designed to discourage dangerous driving behaviors and reduce opportunities for vehicles to enter crossings as trains approach.
Planned improvements include two proven safety countermeasures at high-risk locations:

  • 19 new exit gates, which lower on the far side of the tracks so that, together with the entrance gates, every lane is blocked and motorists can no longer zig-zag around the barriers.
  • Six raised medians, which separate opposing lanes and physically stop motorists from swinging into oncoming traffic to get around a lowered gate.

These improvements make it harder for motorists to bypass crossing gates, helping reduce the potential for collisions and creating safer conditions for everyone traveling through the corridor.

 
Partnerships at Every Level. Lasting Impact.

The Sealed Corridor Project shows what partners at every level can achieve when they share one goal: protecting lives. With FRA's $15.44 million investment, the MPO is leading the effort from planning through construction. Broward County and the cities of Pompano Beach, Wilton Manors, Fort Lauderdale, Dania Beach, Hollywood, and Hallandale Beach are contributing local funding and support, while FEC Railway and Brightline are bringing their expertise to deliver the crossing improvements.
As Broward County continues to grow and rail activity remains an important part of the region's transportation system, investments in crossing safety will be increasingly important to keeping communities connected and safe.
By fixing safety risks with practical, proven infrastructure, the MPO and its partners are helping build a safer transportation network for generations to come.

 
Project Map

Map titled “Broward County Sealed Corridor Project - RCEP Grant Improvements Map” showing the rail corridor running north-south through eastern Broward County and the locations of proposed crossing improvements. Colored markers identify exit gates, raised medians, or both at specific roadway crossings along the corridor, including Copans Road, NE 6th Street, SW 6th Street, NE 24th Street, SW 5th Street, SW 22nd Street, Old Griffin Road, Johnson Street, Washington Street, and other labeled intersections.

 

Improvements

Infographic comparing two railroad crossing safety treatments. Raised median separators placed along the roadway centerline prevent drivers from crossing lanes around lowered crossing gates and reduce violations by 77%. Four-quadrant gates add barriers to block all traffic lanes at a crossing when activated and can reduce violations by up to 86%

 

Grant Application

Expected Results: 

  • Enhanced safety at crossings with over 60 estimated daily train passages.

Community Benefit: 

  • Address safety concerns in a County projected to grow by nearly 2.2 million by 2045.

 Project Draft PE Plans by Crossing:

Copans

NE 6 St

Hammondville

SW 2 St

SW 6 St

NE 56 St

NE 24 St

NE 17 Ct

SW 5 St

SW 6 St

SW 7 St

SW 17 St

SW 22 St

Griffin Rd Opt 1

Griffin Rd Opt 2

NW 1 St

Dixie Hwy Opt 1

Dixie Hwy Opt 2

Dixie Hwy Opt 3

Johnson St

Washington St

NE 3 St

SW 3 St

 

Grant Partners:

BMPO Broward County Sealed Corridor Project Partners 01

For More Information

Please contact Andrew Riddle at riddlea@browardmpo.org or (954) 876-0067 to learn more about the Broward MPO and what they are working on in your community.